Xi'an, Shaanxi Construction Engineering Inspection Co. Guangsha handling procedures of the business
(A) of the material, equipment, components and parts testing procedures commissioned
Step one: fill out a single inspection commission (in duplicate);
Location: Testing Center Division commissioned a mail room or the days of the first floor laboratory mail room
Phone:
Step two: one commissioned by the sample check and sample the administrator to verify witness card (witness the inspection applicable);
Third step: to pay office fees, and receive a voucher to take the report (commissioned by a single No. 2 joint);
Step Four: Report of the certificate by taking the time agreed to send the report window to receive test report.
(B) test piles and foundation commissioned the program
Step One: Fill and foundation pile testing commissioned by the registration form, signed testing agreements;
Location: Testing Center of Integrated Office, Tel:
Step two: provide design drawings, geological investigation report and other relevant information, view the project site, development of test programs;
The third step: on-site conditions are met, notify the admission test;
Step four: with on-site inspection work;
Step five: seven working days after testing is completed, pay the testing fee and receive a test report.
(C) quality inspection of engineering structures and identification of an entity entrusted procedures
Step one: fill out registration forms commission;
Location: Testing Center of Integrated Office, Tel:
Step two: to provide design drawings and other relevant information, providing quality problems of the situation;
The third step: to pay costs of detection and identification;
Step four: detection and identification program by doing site preparation work;
Step five: with on-site inspection work;
Step Six: After work-site inspection 15 working days after receiving the detection and identification report.
(D) civil engineering indoor environmental quality testing procedures commissioned
Step One: advice and fill delegate list;
Location: Testing Center of Integrated Office, Tel:
Step Two: Provide engineering situation, fitting the situation and construction plans, etc.;
The third step: the number of confirmatory testing, testing items, testing costs;
Step four: pay the testing costs, testing time appointment;
Step five: site preparation work is completed, notify the admission test
Step Six: with on-site sampling and testing work
Step Seven: seven working days after completion of field testing and vouchers to take the report.
(E) report changes (replacement) Application Procedures
The first step: the mailroom at the test center to receive commission made changes to (re) application form;
Location: Testing Center of Integrated Office, Tel:
Step two: according to the form required to fill, seal, and provide the necessary supporting documents; witness the inspection of the required witness signatures, witnesses Seal; supervision and sampling of signature to be supervisors;
The third step: the application form, the original report (change applicable) pay commission report issued mailroom window;
Step four: With one week after receipt of the query results.
(F) in the presence of work cards Procedures
Step One: Fill witness registration form and affix the official seal appointed;
Location: Testing Center of Integrated Office, Tel:
Step two: bring along a witness registration form, "construction permit", witness identification and certificate of title (the Commissioner of membership card) a photocopy of each, 1 inch photo a witness (not including the photo on the registration form ), cross-testing center commission mail room;
Step three: complete information and meet the requirements of 5 working days to get witnesses to the work card.
Note: The above business-related forms are available at the test center to receive General Office
Can also be sent by fax.